Customer Success Stories > Automotive

Customer Success Stories

Customer Success Stories > Automotive

Below, you will find a wealth of Wonderware customer success stories from across the globe. From South Africa to Santa Barbara, you can see Wonderware solutions at work in real-world customer situations.

 Note: See also our complete collection of Wonderware video success stories.

If you have questions about a Wonderware customer success story, please contact our Wonderware local sales office.

ActiveFactory

Delta Motor Corp. Uses InTrack and InTouch Software in World-Class Assembly Plant
PORT ELIZABETH, SOUTH AFRICA -- Delta Motor Corporation (DMC) meets the challenges of vehicle manufacturing in the context of a small assembly plant.
View the Success Story (pdf)
—released 10/21/2003

Painting by numbers at Toyota SA’s Durban plant

For Toyota SA Motors to meet its goal of 220 000 units per annum by 2009, it would have to extend the capacity of its two existing paint plants at the company’s Durban factory.  It was decided to add a third paint plant and to use a basic design in line with five other paint plant facilities currently being constructed across the world and to automate this plant with the help of Wonderware industrial software solutions.


View the Success Story (pdf)
—released 9/28/2007

Equipment Operations Module

Tenneco uses Wonderware Production Event Module to track its catalytic converter line

To meet an annual export target of half a million catalytic converters, Tenneco South Africa was looking to achieve a production availability of 85% while eliminating the loss of critical production information and guaranteeing product traceability throughout their Port Elizabeth plant.


View the Success Story (pdf)
—released 9/28/2007

Historian (IndustrialSQL Server)

Gleaming Software Solution for the Central Process Control Technology in Primer Paintshops
“It was possible to realize modifications and new requirements significantly faster and more cost-efficiently thanks to the structured organization and the inheritance capabilities of the system with regard to the objects.” Jörn von Wieding, Project Manager, G&O
View the Success Story (pdf)
—released 9/28/2007

Painting by numbers at Toyota SA’s Durban plant

For Toyota SA Motors to meet its goal of 220 000 units per annum by 2009, it would have to extend the capacity of its two existing paint plants at the company’s Durban factory.  It was decided to add a third paint plant and to use a basic design in line with five other paint plant facilities currently being constructed across the world and to automate this plant with the help of Wonderware industrial software solutions.


View the Success Story (pdf)
—released 9/28/2007

Tenneco uses Wonderware Production Event Module to track its catalytic converter line

To meet an annual export target of half a million catalytic converters, Tenneco South Africa was looking to achieve a production availability of 85% while eliminating the loss of critical production information and guaranteeing product traceability throughout their Port Elizabeth plant.


View the Success Story (pdf)
—released 9/28/2007

InBatch

BP Castrol Oil Uses Wonderware Production & Performance Mgt Solution to Accelerate Production
Wonderware Production and Performance Management Software Solution Speeds Up Production and Competitive Racing Machines Fueled by BP Castrol Oil
View the Success Story (pdf)
—released 1/11/2006

InControl

BP Castrol Oil Uses Wonderware Production & Performance Mgt Solution to Accelerate Production
Wonderware Production and Performance Management Software Solution Speeds Up Production and Competitive Racing Machines Fueled by BP Castrol Oil
View the Success Story (pdf)
—released 1/11/2006

Industrial Application Server

Gleaming Software Solution for the Central Process Control Technology in Primer Paintshops
“It was possible to realize modifications and new requirements significantly faster and more cost-efficiently thanks to the structured organization and the inheritance capabilities of the system with regard to the objects.” Jörn von Wieding, Project Manager, G&O
View the Success Story (pdf)
—released 9/28/2007

Painting by numbers at Toyota SA’s Durban plant

For Toyota SA Motors to meet its goal of 220 000 units per annum by 2009, it would have to extend the capacity of its two existing paint plants at the company’s Durban factory.  It was decided to add a third paint plant and to use a basic design in line with five other paint plant facilities currently being constructed across the world and to automate this plant with the help of Wonderware industrial software solutions.


View the Success Story (pdf)
—released 9/28/2007

Tenneco uses Wonderware Production Event Module to track its catalytic converter line

To meet an annual export target of half a million catalytic converters, Tenneco South Africa was looking to achieve a production availability of 85% while eliminating the loss of critical production information and guaranteeing product traceability throughout their Port Elizabeth plant.


View the Success Story (pdf)
—released 9/28/2007

InTouch

BP Castrol Oil Uses Wonderware Production & Performance Mgt Solution to Accelerate Production
Wonderware Production and Performance Management Software Solution Speeds Up Production and Competitive Racing Machines Fueled by BP Castrol Oil
View the Success Story (pdf)
—released 1/11/2006

Delta Motor Corp. Uses InTrack and InTouch Software in World-Class Assembly Plant
PORT ELIZABETH, SOUTH AFRICA -- Delta Motor Corporation (DMC) meets the challenges of vehicle manufacturing in the context of a small assembly plant.
View the Success Story (pdf)
—released 10/21/2003

Gleaming Software Solution for the Central Process Control Technology in Primer Paintshops
“It was possible to realize modifications and new requirements significantly faster and more cost-efficiently thanks to the structured organization and the inheritance capabilities of the system with regard to the objects.” Jörn von Wieding, Project Manager, G&O
View the Success Story (pdf)
—released 9/28/2007

Painting by numbers at Toyota SA’s Durban plant

For Toyota SA Motors to meet its goal of 220 000 units per annum by 2009, it would have to extend the capacity of its two existing paint plants at the company’s Durban factory.  It was decided to add a third paint plant and to use a basic design in line with five other paint plant facilities currently being constructed across the world and to automate this plant with the help of Wonderware industrial software solutions.


View the Success Story (pdf)
—released 9/28/2007

Tenneco uses Wonderware Production Event Module to track its catalytic converter line

To meet an annual export target of half a million catalytic converters, Tenneco South Africa was looking to achieve a production availability of 85% while eliminating the loss of critical production information and guaranteeing product traceability throughout their Port Elizabeth plant.


View the Success Story (pdf)
—released 9/28/2007

Wonderware's InTouch® HMI Helps Dürr Group Provide Precise Painting Solutions to Multinational Car Manufacturers
Bietigheim-Bissingen, Germany --- If you drive a car, chances are it was painted using a system supplied by Dürr, the world's leading supplier of painting installations for the automotive industry and its supply industries. Dürr plans, constructs and commissions complete paint shops for nearly all the world's car manufacturers...
View the Success Story (pdf)
—released 7/23/2003

Manufacturing Execution Module

Delta Motor Corp. Uses InTrack and InTouch Software in World-Class Assembly Plant
PORT ELIZABETH, SOUTH AFRICA -- Delta Motor Corporation (DMC) meets the challenges of vehicle manufacturing in the context of a small assembly plant.
View the Success Story (pdf)
—released 10/21/2003

SCADAlarm

Gleaming Software Solution for the Central Process Control Technology in Primer Paintshops
“It was possible to realize modifications and new requirements significantly faster and more cost-efficiently thanks to the structured organization and the inheritance capabilities of the system with regard to the objects.” Jörn von Wieding, Project Manager, G&O
View the Success Story (pdf)
—released 9/28/2007

System Platform

Gleaming Software Solution for the Central Process Control Technology in Primer Paintshops
“It was possible to realize modifications and new requirements significantly faster and more cost-efficiently thanks to the structured organization and the inheritance capabilities of the system with regard to the objects.” Jörn von Wieding, Project Manager, G&O
View the Success Story (pdf)
—released 9/28/2007

Painting by numbers at Toyota SA’s Durban plant

For Toyota SA Motors to meet its goal of 220 000 units per annum by 2009, it would have to extend the capacity of its two existing paint plants at the company’s Durban factory.  It was decided to add a third paint plant and to use a basic design in line with five other paint plant facilities currently being constructed across the world and to automate this plant with the help of Wonderware industrial software solutions.


View the Success Story (pdf)
—released 9/28/2007

Tenneco uses Wonderware Production Event Module to track its catalytic converter line

To meet an annual export target of half a million catalytic converters, Tenneco South Africa was looking to achieve a production availability of 85% while eliminating the loss of critical production information and guaranteeing product traceability throughout their Port Elizabeth plant.


View the Success Story (pdf)
—released 9/28/2007